List of completed Construction Projects : Page 2

Air field
Australian Army Special Forces
Tarin Kh
ot - Afghanistan

Levelling of site then spreading and compacting of sub base.
The wearing surface has been treated to a depth of six inches using CBR soil stabilizer.
1.9km long can handle all transport aircraft up to Antinov 124.
Project completed in six weeks whilst runway was still in use by military aircraft.

 

 

UBIQUE Logistics Base
South Sudan Warehouse Facility
Juba. Sudan
Construction of two warehouses,
Total storage capacity of 21,000 square feet.
Presently rented to the UN, as the food storage area for the UN peace keeping troops.
The larger warehouse is for dry storage and the second warehouse is a cold storage unit containing 20 x 40ft freezer containers.
The outside area is fully compacted with good drainage, so that up to 80 trucks may be parked.
The warehousing and land is wholly owned by UBIQUE South Sudan.

 

 

Accommodation Units
ISAF South of Kabul Airport (KAIA). Kabul
Construction of Accommodation units containing:
Double story conix Accommodation Laundry, TV room For ISAF aviation force of ISAF.

 

 

Regional police training facility
Dyncorp- Kandahar
Complete construction of the camp
Ubique group was instrumental in gaining permission to build the camp on government land
The camp consisted
of Guard bunker, Guard office, ID card building, Bomb /mortar shelter
Deep water well, Sewage system, Water mains, Site drainage
Electrical power
Afghan Accommodation 1, Afghan Accommodation 2
Afghan Physical and Tactical Training building, Afghan Kitchen and Dining Facility
Classroom building, Toilet Unit for office and classrooms, Office Building, Food storage
International accommodation, International kitchen & dining facilities

 

 

Supply of jeeps
Afghan Government
Contracted to supply 3,000 jeeps, To be used by the Afghan police department.
Total project cost of over $20 million.
Organised the logistics from Russia to Kabul, including the offloading at Hiaratan border. All the vehicles where delivered without a scratch.

 

 

Clearing and Demining of Lashkar gah Airfield
Lashkar gah

Industrial Park Site Preparation, Helmand, Afghanistan- Tasked to clear, level, and survey a 150 acre site in Helmand Province.
Large amounts of unexploded ordnance posed a hazard to the crews. Working with a de mining company and employing international K-9 teams we overcame this challenge and finished the job ahead of schedule.

 

 

Vegetable Process Factory
Development works - Charikar

Designed, develop & construction of the complete factory project.
Clearing of EODS from site
Construction of factory
Assembly of all process machinery including commissioning of boiler.
All electrical & plumbing.
Connection of all steam pipes including pressure checks as per European safety specs.
Design and construction of waste water system to comply with all environmental laws.
Drilling of 150m deep water well and fitting of pump.