Air field
Australian Army Special Forces
Tarin Khot
- Afghanistan |
|
| Levelling
of site then spreading and compacting of sub
base.
The wearing surface has been treated to a depth
of six inches using CBR soil stabilizer.
1.9km long can handle all transport aircraft
up to Antinov 124.
Project completed in six weeks whilst runway
was still in use by military aircraft.
|
|
| |
| UBIQUE
Logistics Base
South Sudan Warehouse Facility
Juba. Sudan
|
|
| Construction
of two warehouses,
Total storage capacity of 21,000 square feet.
Presently rented to the UN, as the food storage
area for the UN peace keeping troops.
The larger warehouse is for dry storage
and the second warehouse is a cold storage unit
containing 20 x 40ft freezer containers.
The outside area is fully compacted with
good drainage, so that up to 80 trucks may be
parked.
The warehousing and land is wholly owned
by UBIQUE South Sudan.
|
|
|
| Accommodation
Units
ISAF South of Kabul Airport (KAIA). Kabul
|
|
| Construction
of Accommodation units containing:
Double story conix Accommodation Laundry, TV
room For ISAF aviation force of ISAF.
|
|
|
Regional
police training facility
Dyncorp- Kandahar
|
|
| Complete
construction of the camp
Ubique group was instrumental in gaining permission
to build the camp on government land
The camp consisted of Guard bunker, Guard
office, ID card building, Bomb /mortar shelter
Deep water well, Sewage system, Water mains, Site
drainage
Electrical power
Afghan Accommodation 1, Afghan Accommodation 2
Afghan Physical and Tactical Training building,
Afghan Kitchen and Dining Facility
Classroom building, Toilet Unit for office and
classrooms, Office Building, Food storage
International accommodation, International kitchen
& dining facilities
|
|
|
Supply
of jeeps
Afghan Government
|
|
| Contracted
to supply 3,000 jeeps, To be used by the Afghan
police department.
Total project cost of over $20 million.
Organised the logistics from Russia to
Kabul, including the offloading at Hiaratan border.
All the vehicles where delivered without a scratch.
|
|
|
Clearing and Demining of Lashkar gah Airfield
Lashkar gah
|
| |
| Industrial
Park Site Preparation, Helmand, Afghanistan- Tasked
to clear, level, and survey a 150 acre site in
Helmand Province.
Large amounts of unexploded ordnance
posed a hazard to the crews. Working with a de
mining company and employing international K-9
teams we overcame this challenge and finished
the job ahead of schedule. |
|
|
Vegetable Process Factory
Development works - Charikar
|
|
Designed,
develop & construction of the complete factory project.
Clearing of EODS from site
Construction of factory
Assembly of all process machinery including commissioning
of boiler.
All electrical & plumbing.
Connection of all steam pipes including pressure checks
as per European safety specs.
Design and construction of waste water system to comply
with all environmental laws.
Drilling of 150m deep water well and fitting of pump.
|
| |
| |
|