| List
of completed Construction Projects : Page
4 |
|
GSM
Communication towers
20 sites through out Afghanistan including Kabul,
Mazar, Heart, and Kandahar.
Installation of all antennas, microwave dishes,
GPS antennas and all electrical.
Negotiated all land rents
|
|
| |
|
Regional
police training facility
Bamyan
Dyncorp
Site acquisition and clearance
Spreading of crush stone.
Negotiated the permission to demolish the old
jail and government buildings.
Demolition and de-mining of existing buildings.
|
|
|
Accommodation
Units
ISAF
Urgun Patika
Construction of 8 rooms (3x4), shower block, toilet
block & septic tank.
Health Clinic
ISAF
KHOST Province (contract value $200k)
Health clinic, shower block & septic tank.
Major Electrical work
Dyncorp
Gardez (contract value $100k)
Running 400volt cable between 2 power stations at the
national police academy.
Major Electrical work
Dyncorp
Mazar – e - sharief
Running 400volt cable between 2 power stations at the
national police academy.
Major
Electrical work
Dyncorp
Kandahar
Running 400volt cable between 2 power stations at
the national police academy.
Accommodation
Units
Ariana Hotel
Kabul
Construction of 12 accommodation units with all electrical,
plumbing & AC’s.
Accommodation Units
Air port Police
Kabul
Construction of accommodation units containing:13
blocks (46 rooms, by size 3x4), kitchen, deep well,
dining room, power house, septic tank for Afghan National
police in north of Kabul Air Port.
|
Camps
Poppy Education Program
Tarin Kot
Construction of 2 camps for International Security
Assistant Force (ISAF) & Government in Tarin
kot Uruzgan. |
|
|
Camp
# 1
3 x conix accommodation with 2 bedrooms, deep well
1 diesel tank, 1 power house 6x4m, 3 guards tower
1 septic tank, 2 toilet block, 1 shower block, 2
power house with generators, kitchens 6x12m, boundary
wall with hesco’s.
|
|
|
Camp
#2
5 x conix accommodations, 4 x 40’ container
each has 2 bed room with bathroom 2 power house
with installation of generators, 1 shelter for fuel
tank, , , 2 conix refrigerator, kitchen 3x10m, dining
room 14x10m, boundary wall 1000m, 5 guard rooms,
1 septic tank,
|
|
Wells
Development works
Kabul
Drilling of 6 x Deep wells urban of KABUL and fitting
of pumps.
Rehabilitation
Dyncorp - Kabul
Rehabilitation & construction of new accommodation
for DynCorp office in Kabul.
56 x wooden rooms, installation 4 generator, &
rehabilitation 30 rooms.
|
| |
|
Pre
Fabricated building
Pakistan
Border Security
Double storey 40ft container offices
Utilizing extended wooden construction to give
Greater space to the building
|
|
|
|
Pump
house
Canadian Military
Rehabilitation of water pump house
and storage tank.
Installation of new pump and generator
Capable of supplying water to a small town
Over 30 cubic meters per hour |
|
| |
|
|
Pre
Fabricated Buildings
Western Australia
Low cost housing scheme,
Consisting of 30 house units
|
|
Principle
Officer’s Residence
U.S. Consulate
Peshawar Pakistan
Historic restoration included removing years of built-up
repairs and returning the building to the original design
(1964) and intent of its architect. Natural airflow was
restored to the building, allowing for cross-ventilation
throughout.
Presentation
Girls School
Peshawar Pakistan
Numerous works of renovation to existing buildings,
including: addition of stand-alone stairwell to match
existing design; installation of Passive Thermal Cooling
into classrooms; safety improvements such as handrails
and proper sloping of walkways; renovation of roof and
site drainage for reduction of standing water and open
drains, along with associated dangers.
|
| |
|
|
|
|